ATM
ALGER
- Catégories: Informatique & Technologies
- Wilaya: ALGER
- Publiée le: 14-12-2021 à 00:00:00
Description
Mission :
The mission of the BO Transmission is to manage the Operation & Maintenance of ATM Mobilis MW (Only MLTN) and SPO (Ericsson Equipements).Below are the activities that are part of BO Transmission:
Profil :
The mission of the BO Transmission is to manage the Operation & Maintenance of ATM Mobilis MW (Only MLTN) and SPO (Ericsson Equipements).Below are the activities that are part of BO Transmission:
- Taking in charge the problems belonging to BO Transmission domain.
- CRs issued from Transmission Engineering or NPOC Transmission, implementation.
- Regular verification of SW alignment over all transmission nodes.
- New nodes configuration as per the data received from ATM Engineering or NPOC Transmission.
- Isolation & investigation of transmission failures.
- Transmission failures resolution.
- Ericsson local support interfacing.
- TTs and CSR handling.
- Back-up and disc space verification.
- Jobs scheduling over the server in order to collect the back-up for all the configurations related to routine plans.
- Consistencies checks for the back-ups and conflict resolution, if any.
- DCN Plan implementation for the transmission nodes as per ATM Transmission Engineering recommendations.
- Preventives maintenance for the transmission network as per the defined occurrence.
- Perform OJTs (On Job Training) for customer BO Transmission Engineers.
- Coach and Mentor Customer BO Transmission Engineers.
- Provide on regular basis feedback and evaluation of customer engineers.
- Report all activities as per the predefined format and based on the defined regularity.
- Define any work instruction requested by the BO Transmission manager.
- Request TT creation in case the related issues haven’t been reported by FO.
Profil :
- ActivitiesASP/ARPEricsson O&M
- Provide access to transmission nodes/tools;
- Define the templates for all BO Transmission deliverables;
- Provide the contractual Scope of work;
- TTs Resolution;
- Ad’Hoc TTS Creation & Resolution;
- CRs Execution
- Work Instruction creation;
- Network status follow-up;
- Preventive Maintenance;
- Daily Reports;
- Weekly reports;
- Monthly reports;
- Emergency opening and follow-up;
- Follow-up on CSRs;
- Provide OJTs to ATM Engineers;
- Coaching & Mentoring for ATM Engineers;
- Periodic Evaluation for ATM Engineers;
- Dispatching of TT and/or Work Orders to FMO;
- Escalate to BO Trans TL/Manager all hot issues;
- Justify the TTs/CRs that have exceeded the SLA;
Contacter l'annonceur